                                                                                        NEWS






       Fire resistance and stability




       earn Redcliff Quarter




       specification for Magply





       Fire performance, chemical
       composition and resistance to pull-
       out loads were all factors considered
       by one of the leading national
       contractors in the selection of Magply
       MgO boards for the cladding build-up
       on four apartment blocks in Bristol.
       The development in the historic dock
       city’s Redcliff Quarter conservation
       area is being led by Galliford Try for
       developer, Redcliff Quarter MLP with
       the designs of Lyons+Sleeman+Hoare
       Architects combining new build
       structures and elevations with retained
       Victorian brick façades.
       The initial description of the building
       was for phase 1 (114 apartments +
       14 duplex). Redcliff Quarter Phase 2
       is the construction of 118 apartments
       which is a mix of 1 and 2 bedroom
       apartments with 4no retail units along
       cross street. The facades are a mix   area of use for the Magply boards   Backed by BDA Agrement
       of Recon Stone Panels, Brickwork,    on this project is within the build-up   certification, Magply MgO
       composite cladding and El-zinc       for the ‘picture frame’ type feature   boards present a fire-safe and
       Cladding.                            around the main entrance, where      environmentally friendly alternative
       The cladding contractor is responsible   we have secondary steelwork and   to conventional plywood or OSB
                                            Metsec frame to build out from the
                                                                                 products. Additionally, the unique
       for installing all of the El-zinc cladding   main structure.  However, because   production process keeps the chloride
       on the project, utilising Zinc clips   the chosen cladding material is Zinc   content to just 0.01%, enhancing both
       to attach the very distinctive and   you have to be very careful about the   stability and long-term durability. The
       lightweight material over a sub-     chemical composition of what it is in   different thicknesses of panel are also
       structure of steel framing, the 12mm   contact with, to avoid degradation.   widely used as a substrate board for
       thick Magply boards and a breather                                        the direct application of proprietary
       membrane.                            We considered a number of different   render systems, as well as for flooring
                                            board types to meet the required
       Due to the El-zinc material only     fire-rating, but Magply’s PH level   and flat or pitched roof build-ups.
       being 1mm thick added support was    proved to be more compatible with
       required to prevent the cappings from   the zinc, while the manufacturer was   For further information please contact:
       bending out of shape. Traditionally   also able to supply satisfactory data   Gordon Pirret, MD or John Malone,
       this would be ply, however due to the   on pull-out tests, to ensure the stability   UK National Sales Manager
       requirement for all materials to be A2   for the cladding brackets. The boards,   IPP LTD.  Bradwell Hall, Bradwell on
       fire rated in buildings over 18metres   covered by the breather membrane,   Sea, Essex. CM0 7HX.
       ply was not a suitable product.      are also being used beneath all the   Telephone: 01621 776252
       Magply was used in its place due to its   cappings on the building, mounted   Fax: 01621776688
       property’s.                          between the galvanised supports,     Email: gmp@intpetro.com or
       The Externals Manager for Galliford Try,   enabling the contractor to complete   john@magply.co.uk
       Martin Sykes, commented: “The main   all their installation work.”        www.magply.co.uk

       12  modern  builder - issue 97 oct                                                     www.modernbuilder.co.uk
   7   8   9   10   11   12   13   14   15   16   17